MAJOR DEVELOPMENT INITIATIVES COMPLETED
DURING LAST FOUR YEARS IN PUNJAB

During last 4 years an amount of Rs.481.285 billion was utilized under Annual Development Program in Punjab.

§  Rs.196.285 billion for the completion of mega projects costing Rs.200 million and above.

§  Rs.285 billion for the completion of smaller projects.

Year-wise details are as follows:-
Annual Development Program
2008-09 to 2011-12



(Rs. in billion)
Year
Total
Utilization
Mega
Projects completed
(Cost > 200 m)
Smaller
Projects completed
2008-09
132.533
45.726
86.807
2009-10
119.052
47.415
71.637
2010-11
93.909
45.113
48.796
2011-12
135.760
58.031
77.729
Total
481.254
196.285
284.969

Five Years Comparison of Allocations of Major Sectors
Sectors
Total Allocations (Billion Rs.)
2002-03 to 2006-07
2007-08 to 2012-13
Education
11.807
111.278
Water Supply & Sanitation
12.668
43.386
Health
11.371
71.649
Infrastructure Development
104.706
318.493
Southern Punjab
52.750
292.439


Education
  • Performance based incentives for teachers
·         Provision of IT labs to all (4,286) High / Higher secondary schools in the Province (Rs. 4,172 Miilion)
·         Centers of Excellence and Establishment of 10 Nos. Daanish School System to provide quality education to the poor and disadvantaged (Approx. Rs 7,000 Million)
·         Provision of missing facilities in 6,113 School & 23 Colleges
·         Recruitment of 42000 better qualified teachers
·         Provision of solar systems on merit
·         Upgradation of 2788 schools from Primary to Middle and Middle to High level
·         Training of 120,000 Teachers and Managers
·         66 New Degree Colleges established and 13 upgraded from Inter to Degree level
·         10 Billion endowment for Punjab Educational Endowment Fund (PEEF)
·         Laptop scheme for talented students (Over 2 lakh laptops distributed)
·         Establishment of IT University at Lahore
·         Establishment of sub campus of Punjab University at Jhelum
·         Establishment of sub campuses of Sargodha University at Bhakkar and Mianwali
·         Muhammad Nawaz Sharif University of Engineering and Technology at Multan
·         Agriculture Universities at Multan and Burewala
·         Establishment of Women Universities at Multan, Bahawalpur, Faisalabad and Sialkot

Health
·         Establishment of Medical Colleges at Gujrat, D.G. Khan, Sahiwal, Sialkot and Gujranwala
·         Provision of Missing / Additional Facilities in 42 Hospitals in the Punjab
·         Establishment of 3 new THQs
·         Upgradation of 4 RHCs to THQ level
·         Establishment of Services Institute of Medical Sciences, Lahore
·         Establishment of Institutes of Cardiology and Urology at Rawalpindi
·         Establishment of 410 bedded hospital at Bahawalpur (Rs.2,594 Million)
·         New 400 bed hospital at Sargodha
·         New 200 bed hospital at Shahdara (Rs.948 Million)
·         Establishment of Emergency Blocks at 5 DHQ Hospitals
·         Improvement program for all teaching hospitals
·         Introduction of Mobile Health Units in South Punjab
·         Construction of Phase-II Shiekh Zaid Medical College Rahim Yar Khan
·         Construction of Trauma Centre at Bhera Service Area

Water Supply & Sanitation
Some of the major projects initiated / completed under this sector are as follows:-
·          
Sewerage Scheme with Treatment Plant at R.Y.Khan City (Rs.2,526 Million)
·          
Ext. & Improvement  Urban Water Supply Scheme, D.G.Khan city & Adj. abadies (Rs.141 Million)
·          
Ext. & Improvement  of Urban Sewerage Scheme, D.G.Khan (Rs.604 Million)
·          
Kasur Environmental Improvement Project
·          
Urban Water Supply Scheme T.T.Singh
·          
Construction of Urban Water Supply Scheme Gujrat
·          
Urban Water Supply & Sewerage Scheme Pakpattan & Arifwala.
·          
Urban Sewerage/Drainage Scheme Muridke
·          
Urban Water Supply Scheme Muzaffargarh
·          
Comprehensive Water Supply & Sewerage Scheme Mianwali
·          
Comprehensive Water Supply & Sewerage Scheme Khushab
·          
Comprehensive Water Supply & Sewerage Scheme Joharabad
·          
Urban Water Supply & Sewerage Drainage Scheme Samundari
·          
Urban Water Supply & Sewerage Drainage Scheme Phoolnagar, Kasur.
·          
Rehabilitation and Augmentation of Water Supply Scheme, Bahawalpur
·          
Urban Water Supply Scheme with Treatment Plant, Jhelum
·          
Urban Sewerage Drainage Scheme Kamonki.
·          
Comprehensive Sewerage Drainage Scheme Sheikhupura City.
Road
During last four years about 1800 Kms roads were widened from 10-12 ft to 24 ft and 700 Kms new roads were constructed. Some of the major schemes of Road Sector include:
·         Completion of Lahore ring Road 40 kms (Northern Loop).
·         Construction of dual carriageway from Gujrat to Salam Interchange.
·         Dualization of Kasur – Depalpur Carriageway
·         Dualization of Lahore – Kasur Road Section
·         Construction of bridge at Chak Nizam on river Jhelum.
·         Bridge over River Indus between Bangla Ichha and Rojhan
·         Construction 4 Lanes Lahore Wagha Road
·         Dualization of Lahore Ferozepur Road (Lahore to Kasur) Section Km 15.15 to 26.65 length 11.50 Km from Khaira Distributory to Kahna (Pahse-I).
·         Widening / Improvement of SCTM road from Chakwal District Boundary to Mianwali Km No. 176.39 to 216.76 = 40.37 Km in Mianwali District.
·         Improvement of Kahala Bridge Road, L = 25 Kms.
·         Rawalpindi Roads Rehabilitation Project.
·         Widening / Improvement of road starts from L.M.Q. Road and ends at Nawab Pur Road Length 9.52 Kms in District Multan.
·         Widening / Improvement of Jotoi to Karam Dad Qureshi Road, length = 82.00 Kms.
·         Conversion of Main Road leading from Bahawalpur to G.T. road in Dual Carriageway (Bahawalpur - Multan road) Length = 3.35 Km
·         Widening / Improvement of Suraj Miani Road which starts from Katchery Chowk and ends at Northern Bye Pass Length = 4.60 Kms in District Multan.
·         Widening / improvement of Narowal – Shakargarh Road.
·         Dualization of Sialkot – Wazirabad Road.
·         Widening / Improvement of road from Hafizabad to Pindi Bhattian
·         Dualization of Faisalabad - Summundari road (Section between Faisalabad Bypass to Summundari), Faisalabad.
·         Widening / Improvement of road from Faisalabad Bypass road to Mari Pattan, Faisalabad.
·         Construction of flyover to connect N-5 with Bahawalpur City.
·         Construction of Chiniot - Sargodha - Khushab road.
·         Construction of Jhang Bypass.
·         Dualization of Lahore Jaranwala Road.
·         Widening / Improvement of Jhang – Shorkot – Kabirwala Road.
·         Widening / Improvement of Jhang T.T. Sing – Chichawatni Road.
·         Dualization of Eastern Bypass Gujranwala.
·         Widening / Improvement of Pindi Bhattian – Chiniot – Kamalpur Road.
·         Construction of flyover at Thokar Niaz Baig.
·         Construction of Flyover at Kalma Chowk.
·         Construction of Flyover at Muslim Town More
·         Construction of Flyover at Chandni Chowk Rawalpindi.
·         Improvement / Rehabilitation of Multan Road from Thokar Niaz Baig to Scheme Morr.
·         Chief Minister Priority Development Programme 
o   Flyover at 6th Road Junction, Rawalpindi.
o   Construction of Road Bridge between District Mianwali and Jand, District Attock.
o   Construction of Underpass at Abdullahpur, Faisalabad.
o   Construction of Flyover at Peshawar Road near Pirwadai, Rawalpindi.
o   Widening / Improvement of Road from Bahawalpur Byepass to Chungi No.9, Multan, 5.21 Km. (Section Chungi No. 9 - Khayyam Cinema - Old Khanewal Adda Length 1.21 Km, Phase 1)
o   Construction of Flyover on G.T Road in Gujranwala.
o   Bridge on River Ravi Qutab Shahana, District Sahiwal (PC-II).
o   Improvement / Renovation of existing Multan Road, Lahore (Remaining section from Scheme Morr to Chauburji), Length = 3.5 Kms except Sewerage works.
o   Dualization of Arifwala to Bahalwalnagar Road, Length 17 Kms.
o   W/I of Ali Pur Muzaffargarh Road (Section Ali Pur – Shehr Sultan), Length 21 Kms.
o   Construction of metalled road Jail road, D.G.Khan
o   Construction of metalled road Chourata Chowk to Multan Road, D.G.Khan
o   Construction of metalled road from pull dat to college road, D.G.Khan
o   Widening / Improvement from Kallar Kahar to Choa Saiden Shah, Length 30.50 Kms, District Chakwal.
o   Rehabilitation of Gujranwala – Hafizabad Road, Length 41.80 Kms.
o   Widening / Improvement of Tibba Sultan Pur to Luddan Road via Mitroo from Km 9.35 to 43.40 & 44.80 to 65.25, Length 54.50 Kms in District Vehari.
o   Dualization of Hasilpur – Bahawalpur road (Widening / Improvement, Hasilpur – Bahawalpur road Length 76.43 Kms i/c Dualization in Built up area (Length 11.59 Kms), Length 88.63 Kms, District Bahawalpur.
o   W/I Of Chishtian – Dahranwala – Fortabbas Road, length 43.25 Kms, District Bahawalnagar.
o   Construction of Byepass for Khan Pur City from Pakistan Chowk to Grid Station, Length 9.50 Kms, District R.Y Khan.
o   Surveying, Soil Investigation, Feasibility Study and Detailed Design etc of proposed Bridge over River Indus, District Layyah (PC-II).
o   Widening / Improvement of Qaziabad MM Road to Nawan Kot, Length 33.07 Kms, District Layyah.
o   W/I of road from Misri Morr to Khewra via PD Khan (52 Kms, metalled width 24-ft, treated shoulders 4-ft on both sides). Distt. Jhelum
o   Dualization of T.H.A.T road from Jahanian Chowk to Hattian via Motorway Interchange, Length 17.60 Kms, District Attock
o   Construction of high level bridge over River Jhelum at Langarwal Pattan, District Sargodha Khushab. (PC-II)
o   Construction of bridge at Upper Jhelum Canal (Jaggu Pull). Gujrat.
o   Widening / Improvement of road from Adda Jahan Khan to Kotala Jam via 36 Wala Khokha & Samlan Wala More, length 22.00 Kms, District Bhakkar.
o   Construction of Bypass including Widening / Improvement of existing road from Bhakkar Darya Khan road at Shafiq Memorial Hospital to Bhakkar Behal road via Dilkusha Garden Niwani road & Murani road, length 12.60 Kms, Tehsil and District Bhakkar.
o   Construction of road from Qadirabad to Pindi Bhattian via Chak Chatha, length 67 Kms, Hafizabad.
o   Widening / Improvement of remaining portion of Bedian Road including construction of bridge over BRB Canal, Lahore

Irrigation & Power
During the last four years. Eleven small dams in pothohar area were completed benefiting an area of 20,945 acres. Besides lining of channels for about 515 KMs. Improvement in Drainage and flood protection works for 255 KMs were completed. Some of the major initiatives projects of this sector are as follows:
·         Taunsa Barrage Emergency Rehabilitation and Modernization
·         Lower Bari Doab Improvement Project
·         Punjab Irrigation System Improvement Project (PISIP)
·         Construction of Chahan, Sowrra, Arrar, Mughlan and Chera Dam
·         Lower Chenab Canal, LCC Part-B
·         Punjab Barrages Improvement, Phase-II Project (PBIP-II), Jinnah Barrage
·         New Khanki Barrage Construction Project
·         Remodeling of SMB Link Canal

Energy

·         Renewable Energy Development Programme (REDSIP) Construction of Marala Hydel Power Station (Rs 4 bn) and 4 other hydel stations with Asian Development Bank (ADB) assistance. Total 86 Mw generation would be possible with these new schemes.
·         Coal based power plant of 50 MW being set up at Sundar Industrial Estate.

Urban Development
In Urban Development Sector, Government’s strategy was based on making large cities “engine of growth” and Rehabilitation / augmentation of municipal services in the cities
  • During last four years 683 schemes pertaining to improvement of Urban infrastructure have been completed. Some of the major schemes initiated during in last four years are as follows:
o   Completion of Lahore Ring Road Northern Loop
o   Construction of Shalimar Interchange
o   Widening / Improvement of Maulana Shaukat Ali Road
o   Rehabilitation of Roads in Gujranwala, Faisalabad and Rawalpindi Cities
o   Widening / Improvement of Canal Bank Road, Lahore
o   Trunk Sewer from Shadi Pura to Salamat Pura, Lahore
o   Replacement of Outlived Water Supply Lines - Gastroenteritis (23 Schemes)
o   Gastro Projects (4) of WASA , Faisalabad
o   Construction of Northern Bypass Road  from LMQ Road to Bosan Road (Dual Carriageway) with Service Road – Phase-I Multan
o   Water Supply Scheme Phase-VI , Multan
o   Gastroenteritis mitigation programme, Lahore and Gujranwala
o   Widening / Improvement of Roads in Gujranwala City
o   Improvement of Urban Infrastructure in four cities i.e. D.G.Khan, Sargodha, Sahiwal and Chiniot (costing Rs.2.5 bn) under the Urban Renewal Programme for intermediate cities.

Agriculture
·         Promotion of Tunnel Technology for value addition and exports
·         Targeting Food Security through Productivity Enhancement in major crops
·         Farm Mechanization for Food Security
·         Introduction of solar energy pumps for irrigation
·         Establishment of Rice Research Institute at Bahawalnagar
·         In service Training Institute, Layyah
·         Potato Research Institute, Sahiwal
·         Rehabilitation of Water Logged and Salinity Affected Area (Bio Saline-II)
·         Fruit & Vegetable Development Project
·         Punjab Irrigated Agriculture Productivity Improvement Project (PIPIP)(Rs 32 billion)
·         Subsidy for Provision of Green Tractors

Ø  Rs.4.62 billion and Rs.2.099 billion were spent for the rehabilitation of damaged irrigation and road infrastructure respectively in the flood affected areas.

Ø  Rs.9.152 billion was provided for flood relief under Watan Card scheme in flood affected Districts.

…………………………………
                                                                                                                                                   